PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing storm piping at the 4th floor Facing East.jpg Installing Storm piping at the High Roof Facing West.jpg Interior metal Framing at the 3rd floor Waiting Area Facing North-West.jpg Laying out block at the 2nd floor UCIA Facing North-East.jpg Erecting the stone panels at the South Elevation 1.jpg Erecting the stone panels at the South Elevation 2.jpg Erecting the stone panels at the South Elevation 3.jpg Installing pipe hangers at the 4th floor Facing North.jpg Parapet along the High Roof Facing East.jpg
Previous pageNext page Erecting the stone panels at the South Elevation 1
Erecting the stone panels at the South Elevation 1